Case

Case

Shaanxi History Museum Project272026-04

Shaanxi History Museum Project

Project Name: Shaanxi History Museum Project
Qinchuan Petroleum — Plant and Office Building272026-04

Qinchuan Petroleum — Plant and Office Building

This project measures 75 meters in length, 36 meters in width (18 m × 2), and 10.5 meters in height, with a total floor area of 2,700 square meters. It features a portal steel frame structure, with the building envelope constructed using field-assembled profiled color steel panels.
Light Optoelectronics Company Plant272026-04

Light Optoelectronics Company Plant

The No. 1 Steel Structure Factory Building project—part of Shaanxi Light Electronic Technology Co., Ltd.’s Xi’an R&D Base—is located within the Chang’an Communication Industry Park. Featuring a steel frame structure, the building stands 18 meters high with a total floor area of nearly 8,000 square meters; the construction duration was 40 days.
Kepler Biotechnology Industrial Park272026-04

Kepler Biotechnology Industrial Park

The facilities for Shaanxi Kepler Biotechnology Co., Ltd. and Sigma Biotechnology Co., Ltd. were constructed by Shaanxi Huabang Construction Engineering Co., Ltd. Located in Jiangzhang Town, Fufeng County, the project covers a total land area of approximately 22,000 square meters, with a total investment of approximately 70 million RMB; both components are designated as key projects under the "12th Five-Year Plan" for Fufeng County, Baoji City.
CR Vanguard Beiguan Supermarket272026-04

CR Vanguard Beiguan Supermarket

The CR Vanguard Beiguan Store is located on Beiguan Zhengjie in Xi'an. The building features a total floor area of 20,016.81 m² and a three-story, all-steel frame structure with a height of 16.5 meters. It was designed and constructed as a Class II building, incorporating a comprehensive lightning protection system.
Hengxing Juice Zhongning Plant272026-04

Hengxing Juice Zhongning Plant

The facility for Shaanxi Hengxing Juice & Beverage Co., Ltd. features a steel-structure portal frame system. It encompasses a total construction area of 45,000 m² (distributed across sites in Chunhua and Heyang, Shaanxi; Qixian, Shanxi; Zhongning, Ningxia; and Jingchuan, Gansu), with a total project cost of 31 million RMB.